UNPACKING AND INSTALLATION
3
OF THE UNIT
3.6 INSTALLATION PROCEDURES AND INSTRUCTIONS.
WARNING!
Before carrying out work on the terminal board or on UPS internal parts, ensure that the UPS
is switched off , remove the power supply, open the external battery cabinet disconnectors,
isolate the system and wait 5 minutes.
For the power connections to the connecting bars use cables with tinned eyelets only.
3.6-1
OPEN
OPEN
3.6-4
Power connections.
L11
AUX MAINS
SUPPLY
14
IOMMASIPXX07-GB 02
3.6-2
N1
L14
N4
L12
OUT TRANSFORMER IN TRANSFORMER
MASTERYS IP+
3.6-3
For systems installed on raised fl oor.
B
A
A. power cables
B. control cables
L1
L2
L3
N
+B2
-B2
MAINS SUPPLY
EXT. BATTERY
N2
40-60 kVA 3/1
20 cm
90°
B
A
-B1
+B1