Gossen MetraWatt ProFiTEST C-GB int. Operating Instructions Manual page 11

Test instrument per din vde 0100
Table of Contents

Advertisement

B Prerequisites for Software Update or Data Exchange
Find the interface to which the PROFiTEST
Note
Always start this function first, before performing an update or chang-
ing report templates.
After starting this function, WinProfi loads the report files specifi-
cally necessary for the connected instrument. Due to the fact that
WinProfi has been created for use with several types of test instru-
ments, incorrect test reports may otherwise be loaded, or errone-
ous options may be made available.
Query information regarding current software version.
GMC-I Messtechnik GmbH
C Transmission of a Software Update to the Test Instrument
®
C is connected.
Depending upon the utilized PC, transmission takes from 1 to 2 minutes.
The NETZ/MAINS LED of the PROFiTEST
cates that the instrument is ready to receive data. If the PC and the test instrument are
correctly synchronized, the same LED lights up yellow. During programming sequences,
the U
ing order. Upon completion of data transmission, the NETZ/MAINS LED briefly lights up
green, afterwards all LEDs go out.
The message „Transmission done" appears on the computer screen.
PC: Select the Update All function from the Update menu. Follow the in-
structions which appear at the monitor.
and RCD/FI LEDs light up red and the NETZ/MAINS LED lights up yellow in alternat-
L
!
Attention!
The instrument may not, under any circumstances, be switched
off during transmission, nor may the connection between the in-
strument and the PC be interrupted!
®
C test instrument lights up green and indi-
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ProFiTEST C-GB int. and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents