4.2.5.2 Procedure
The base station has 2 grounding screws located on the bottom side of the base station, as
shown in Figure 4-22. Follow the steps below to connect grounding to the base station.
Figure 4-22: Grounding Screws
Unscrew one grounding screw, and connect the GPS lightning arrestor ground cable to
1.
the grounding screw on the base station, as shown in Figure 4-23.
Figure 4-23: GPS Lightning Arrestor Grounding Cable
Unscrew another grounding screw, and connect one end of the ground cable to the
2.
grounding screw on the base station, as shown in Figure 4-24.
Figure 4-24: Attached Grounding Cables
As part of installing the base station on the tower, pole, or wall, you will connect the other
3.
end of the ground cable to a good ground (a direct physical connection to the earth).
28