Out-Of-Box Audit; Table 2-1: Shipping List - Baicells Nova 1W Installation Manual

Table of Contents

Advertisement

Out-of-Box Audit

2
Before opening the box, check to see if the outer packaging is damaged or wet. If it is, or if any
items inside are missing or damaged, report the issue to the supplier within 10 days. Table 2-
1 is a shipping list showing the quantity of each item you should receive.

Table 2-1: Shipping List

Item
Base Station
AC/DC Power
Adaptor
U-type Clamp Pole
Mounting Kit
Pole Mounting
Bracket
Waterproof DC
Power Connector
Waterproof
Ethernet Connector
Qty
Description
1
This is the 1W base
station. Check the tag on
the unit to ensure you
received the correct model
base station.
1
100V to 277V AC to 48V
DC adaptor
2
Used to install the base
station on a pole. Includes
(2) U-type clamps, (2)
omegas, and (4) M8 nuts.
2
Fixed accessory
1
-
1
-
10
Photograph of Item

Advertisement

Table of Contents
loading

Table of Contents