pBS11004 Base Station Installation Guide

2. Out-of-Box Audit

Before opening the box, make sure the package is in good condition, undamaged and
not wet. During the unpacking, avoid potential damaging impacts from hits or excessive
force. Once unpacked, check the contents to see if they are consistent with that in the
shipping list shown in Table 2-1.
No.
Item
1
pBS11004 base station
2
Base station mounting
bracket
3
Integrated bracket for on
pole or on wall
4
U shape clamp
5
Omega
6
Screw package
7
PoE power adaptor
8
Power cable
9
Ground terminal
10
Warranty
11
Certification
12
User guide
Note:
During the unpacking, if the outer package is damaged or wet, stop unpacking and find the cause.
Report the issue to the vendor. For any shortage or damage that is identified, report the local vendor
within 10 days.
Table 2-1 Shipping List
Quantity
Check whether the base station's tag
1
is consistent with the requirement
1
Fixed with base station
1
Used for fix on pole or on wall
1
Used for fix on pole
Used for fix on pole
1
M6*12 combined screw * 8
M8 hex nut * 2
1
-
1
The length is 1m.
1
Used for making ground cable.
1
-
1
-
1
-
5
Description