Route Of Electric Wiring - Kubota u15-3 Workshop Manual

Table of Contents

Advertisement

WSM U15-3
u. Route of Electric Wiring
1. Unloading, horn
(6)
(7)
(8)
(9)
Wiring of the horn switch at the right of the operation stand
(1)
(2)
(3)
(4)
(2)
(3)
(1)
(5)
(6)
(1) Fix it at 2 positions from inside.
(2) Unloading switch
(3) Connector
(4) Clamp the cable once when it comes out of
the hole.
(5) Clamp and pass it through the hole 5.5.
(6) Branch of wire harness
(7) Pass it behind the round bar.
(8) Clamp it at 2 positions.
(9) Insert a clip into the swivel frame.
(1) One-finger clearance should be secured
after clamping the cables and turning the
lever in every direction.
(2) Length to the clamp: 200 mm
(3) Caulk it by caulking tool.
(4) Clamp (134L)
(5) The connector at main wire harness side
and the clamp at wiring side should be fixed
firmly to the bracket.
(6) Clamp (112L, 2-3. 2T)
II-174
(4)
(5)

Advertisement

Table of Contents
loading

Table of Contents