Control Levers And Linkage; Lever Strokes And Operating Forces - Kubota u15-3 Workshop Manual

Table of Contents

Advertisement

WSM U15-3
c. Control levers and linkage

1. Lever strokes and operating forces

Stroke
Boom lever
Operating force
Play
Stroke
Arm lever
Operating force
Play
Stroke
Bucket lever
Operating force
Play
Stroke
Swivel lever
Operating force
Play
Stroke
Operating force
Clearance LH/RH lever
at neutral position.
Travel lever
Clearance LH/RH lever
at most forward and
backward position.
Clearance LH/RH lever
Acceleration lever
Operating force
Stroke
Dozer lever
Operating force
Lock lever, up
Operating force
Lock lever, down
Operating force
Swing pedal
Operating force
Travel high SW
Operating force
Unit
U15-3
mm
72
N(kgf)
13.7 (1.4)
> =
mm
2
mm
72
N(kgf)
13.7 (1.4)
> =
mm
2
mm
74
N(kgf)
13.7 (1.4)
> =
mm
2
mm
74
N(kgf)
13.7 (1.4)
> =
mm
2
mm
75
N(kgf)
15.0 (1.5)
mm
5
mm
10
mm
2 ~ 5
N(kgf)
35.0 (3.4)
mm
80
N(kgf)
30.0 (3.1)
20 (2.0)
30 (3.0 )
N(kgf)
98.0 (10.0)
N(kgf)
-
II-28
Reference on new vehicle
Remarks
Measured at the grip end
Measured 20 mm below the grip end
Measured at the grip end
Measured 20 mm below the grip end
Measured at the grip end
Measured 20 mm below the grip end
Measured at the grip end
Measured 20 mm below the grip end
Measured at the grip end
Measured 20 mm below the grip end
Longitudinal direction
Longitudinal direction
Lateral direction
Measured 30 mm below the grip top
Measured at the grip end
Measured 20 mm below the grip end
Measured at the grip end

Advertisement

Table of Contents
loading

Table of Contents