Sources - GE C70 Instruction Manual

Capacitor bank protection and control system
Hide thumbs Also See for C70:
Table of Contents

Advertisement

CHAPTER 6: ACTUAL VALUES

6.4.2 Sources

6.4.2.1 Menu
ACTUAL VALUES  METERING  SOURCE SRC 1
 SOURCE SRC 1
This menu displays the metered values available for each source.
Metered values presented for each source depend on the phase and auxiliary VTs and phase and ground CTs assignments
for this particular source. For example, if no phase VT is assigned to this source, then any voltage, energy, and power
values are unavailable.
6.4.2.2 Phase current metering
ACTUAL VALUES  METERING  SOURCE SRC 1  PHASE CURRENT
 PHASE CURRENT
 SRC 1
C70 CAPACITOR BANK PROTECTION AND CONTROL SYSTEM – INSTRUCTION MANUAL
 PHASE CURRENT
 SRC 1
 GROUND CURRENT
 SRC 1
 PHASE VOLTAGE
 SRC 1
 AUXILIARY VOLTAGE
 SRC 1
 POWER
 SRC 1
 FREQUENCY
 SRC 1
 CURRENT HARMONICS
 SRC 1
 VOLTAGE HARMONICS
 SRC 1
SRC 1 RMS Ia: 0.000
b: 0.000 c: 0.000 A
SRC 1 RMS Ia:
0.000 A
SRC 1 RMS Ib:
0.000 A
SRC 1 RMS Ic:
0.000 A
SRC 1 RMS In:
0.000 A
SRC 1 PHASOR Ia:
0.000 A
0.0°
SRC 1 PHASOR Ib:
0.000 A
0.0°
SRC 1 PHASOR Ic:
0.000 A
0.0°
SRC 1 PHASOR In:
0.000 A
0.0°
SRC 1 ZERO SEQ I0:
0.000 A
0.0°
See below
See page 6-16
See page 6-16
See page 6-17
See page 6-17
See page 6-18
See page 6-18
See page 6-19
METERING
6
6-15

Advertisement

Table of Contents
loading

Table of Contents