GROUPED ELEMENTS
One element is provided per each VT bank to a maximum of three.
This element is used to give a time-delay operating characteristic versus the applied fundamental voltage (phase-to-
ground or phase-to-phase for wye VT connection, or phase-to-phase for delta VT connection) or as a definite time
element. The element resets instantaneously if the applied voltage exceeds the dropout voltage. The delay setting selects
the minimum operating time of the phase undervoltage. The minimum voltage setting selects the operating voltage below
which the element is blocked (a setting of "0" allows a dead source to be considered a fault condition).
5
5.7.8.3 Phase overvoltage (ANSI 59P, IEC PTOV)
SETTINGS  GROUPED ELEMENTS  SETTING GROUP 1(6)  VOLTAGE ELEMENTS  PHASE OVERVOLTAGE1(3)
 PHASE
 OVERVOLTAGE1
5-214
PHASE UV1
CURVE: Definite Time
PHASE UV1
DELAY: 1.00 s
PHASE UV1 MINIMUM
VOLTAGE: 0.100 pu
PHASE UV1 BLOCK:
Off
PHASE UV1
TARGET: Self-reset
PHASE UV1
EVENTS: Disabled
Figure 5-111: Phase undervoltage1 logic
PHASE OV1
FUNCTION: Disabled
PHASE OV1 SIGNAL
SOURCE: SRC 1
PHASE OV1
PICKUP: 1.000 pu
PHASE OV1 PICKUP
DELAY: 1.00 s
C70 CAPACITOR BANK PROTECTION AND CONTROL SYSTEM – INSTRUCTION MANUAL
CHAPTER 5: SETTINGS
Range: Definite Time, Inverse Time
Range: 0.00 to 600.00 s in steps of 0.01
Range: 0.000 to 3.000 pu in steps of 0.001
Range: FlexLogic operand
Range: Self-reset, Latched, Disabled
Range: Disabled, Enabled
Range: Disabled, Enabled
Range: SRC 1, SRC 2, SRC 3, SRC 4, SRC 5, SRC 6
Range: 0.004 to 3.000 pu in steps of 0.001
Range: 0.00 to 600.00 s in steps of 0.01