4 Mounting
Welding the socket
Sealing/Screwing in
threaded versions
Sealing/Screwing in
flange versions
Sealing/Screwing in hy-
gienic fittings
Wall mounting
14
Fig. 5: Temperature ranges
1
Process temperature
2
Ambient temperature
4.2 Mounting steps
For mounting VEGABAR 52, a welded socket is required. You can find
these components in the supplementary instructions manual "Welded
socket and seals".
Seal the thread with teflon, hemp or a similar resistant seal material on
the process fitting thread 1½ NPT.
à Screw VEGABAR 52 into the welded socket. Tighten the hexagon
on the process fitting with a suitable wrench. Wrench size, see
chapter "Dimensions".
Warning:
The housing must not be used to screw the instrument in! Applying
tightening force can damage internal parts of the housing.
Seal the flange connections according to DIN/ANSI with a suitable,
resistant seal and mount VEGABAR 52 with suitable screws.
Use the seal suitable for the respective process fitting. You can find
the components in the supplementary instructions manual "Welded
socket and seals".
4.3 Mounting steps, external housing
Mark the holes according to the following drilling template
1
Depending on the mounting surface, fasten the wall mounting
2
plate with 4 screws
1
VEGABAR 52 • 4 ... 20 mA/HART
2