Mounting; General Instructions; Instructions For Installation; Mounting Steps - Vega VEGABAR 14 Operating Instructions Manual

Hide thumbs Also See for VEGABAR 14:
Table of Contents

Advertisement

Suitability for the pro-
cess conditions
Mounting position
Welding the socket
Sealing/Screwing in
VEGABAR 14

4 Mounting

4.1 General instructions

Make sure that all parts of the instrument exposed to the process, in
particular the sensor element, process seal and process fitting, are
suitable for the existing process conditions. These include above all
the process pressure, process temperature as well as the chemical
properties of the medium.
You can find the specifications in chapter "Technical data" or on the
type label.

4.2 Instructions for installation

VEGABAR 14 functions in any installation position. It is mounted
according to the same directives as a manometer (DIN EN 839-2).
Information:
We recommend using lock fittings, measuring instrument holders and
siphons from our line of accessories.

4.3 Mounting steps

For mounting VEGABAR 14, a welded socket is required. You can find
these components in the supplementary instructions manual "Welded
socket and seals".
Use the attached seal:
Process fitting GV, GB and GP
l
- or -
Seal the thread with teflon, hemp or a similar resistant seal material:
Process fitting GN
l
à Screw VEGABAR 14 into the welded socket. Tighten the hexagon
screw on the process fitting. Wrench size, see chapter "Dimen-
sions", torque see chapter "Technical data".
4 Mounting
9

Advertisement

Table of Contents
loading

Table of Contents