If the heating up
time is more than
40 sec., change the main
pcb.
Prime the fluid sys-
tem before pressure
test and flow rate meas-
urement.
F U N C T I O N T E S T S
Heating up time
1. Plug into mains and press power
button.
Priming of fluid system
3. Check resp. fill water tank.
4. Place a recipient under outlet.
2. Check the heating up time (time until
power button stops blinking). The
time must be not more than 40 sec.
5. Set selection lever at positions
)
(cold) and
(hot) separately for
about 10 sec. to prime the fluid
system.
(