New wire routing
5. Lead connectors through opening in centerpart.
6. Remove NTCwires from cable guides on extraction head.
7. Remove both hoses from thermoblock (Z).
8. Remove hose from top of pump (T).
9. Pull hoses through rubber bushings in centerpart.
R E P A I R
Rear view.
The pressure hoses
and clips have to be
discarded together with
the defect extraction
head.