The pLAN address can only be confirmed as follows:
A)
Disconnect pLAN (connectors J10 and J11) from all pCo2 and pCo3 controller(s).
B)
Cycle power to the controller and then hold down both the Left Arrow (alarm) and the Up Arrow keys
simultaneously as the controller completes its Self-Test routine. The controller will then show you the
present pLAN address of the controller. Verify that the pLAN address matches the desired address from the
above table (Dec. rows). If the address needs to be changed, follow the instructions displayed on the pCo3
controller's LCD display. Press enter when done.
C)
Only after all controllers pLAN addresses have been set/confirmed can the pLAN network connectors be
re-connected.
MicroTech II Operator Interface Touch Screen (OITS) Settings
Settings for any type of linked multiple compressor operation must be made to the MicroTech II controller.
Settings on a dual compressor unit are made in the factory prior to shipment, but must be verified in the field
before startup. Settings for multiple chiller installations are set in the field on the Operator Interface Touch
Screen as follows:
Maximum Compressors ON – SETPOINTS - MODES screen, Selection #10 '= 2 for a dual, 4 for 2 duals, 3 for
three separate, single compressor chillers, etc. If all compressors in the system are to be available as normal
running compressors, then the value entered in #10 should equal the total number of compressors. If any
compressors are for standby and not operated in normal rotation, they should not be included in the compressor
count in Selection #10. The Max Comp ON setting can be made in only one touchscreen, the system will observe
the highest number set on all chillers-it is a global setting.
Sequence and Staging – SETPOINTS - MODES screen, Selection #12 & #14; #11 & #13. Sequence sets the
sequence in which compressors will start. Setting one or more compressors to "1" evokes the automatic lead/lag
feature and is the normal setting. The compressor with least starts will start first and the compressor with
maximum hours will stop first, and so on. Units with higher numbers will stage on in sequence.
The Modes setpoints will do several different types of operation (Normal, Efficiency, Standby, etc.) as described
in the operating manual.
The same Modes setting must be replicated on each chiller in the system.
Nominal Capacity – SETPOINTS - MOTOR screen, Selection #14. The setting is the compressor design tons.
Compressors on dual units are always of equal capacity.
Operating Sequence
For multiple-chiller, parallel operation, the MicroTech II controllers are tied together by a pLAN network and
stage and control compressor loading among the chillers. Each compressor, single or dual compressor chiller, will
stage on or off depending on the sequence number programmed into it. For example, if all are set to "1", the
automatic lead/lag will be in effect.
When chiller #1 is fully loaded, the leaving chilled water temperature will rise slightly. When the Delta-T above
setpoint reaches the Staging Delta-T, the next chiller scheduled to start will receive a start signal and start its
pumps if they are set up to be controlled by the MicroTech controller. This procedure is repeated until all chillers
are running. The compressors will load-balance themselves.
If any of the chillers in the group are dual compressor, they will stage and load according to the staging
instructions.

WCC Settings

Since the WCC is essentially two chillers combined into one counterflow, single pass, dual-circuit chiller, the
compressor on the downstream circuit (leaving chilled water) must always be designated as the Stage 1
compressor-first on, last off.
OM Centrif Micro ΙΙ-5