Checklist For Commissioning - REMEHA Quinta Ace Installation, User And Service Manual

Table of Contents

Advertisement

14 Appendix
14.3

Checklist for commissioning

Tab.41
Checklist
No.
Commissioning tasks
1
Fill the system with water and check the water pressure
2
Fill the siphon with water
3
Vent the central heating system
4
Check water-side connections for tightness
5
Check the gas supply pressure
6
Check the capacity of the gas meter
7
Check the gas tightness of the connections and gas pipes
8
Vent the gas supply pipe
9
Check the electrical connections
10
Check the flue gas outlet/air supply connections
11
Checking the function and operational status of the boiler
12
Check the air-gas ratio
13
Remove the measuring equipment and close the measuring points
14
Correctly fit the front housing of the boiler
15
Set the room thermostat or the control
16
Instruct the user and hand over the necessary documents
17
Complete the guarantee card online
18
Confirm the commissioning
Date
.
.
Company name, signature of engineer
.
.
76
Confirmation
dd-mm-yy
7625116 - v.04 - 17012017