Unpacking & Initial Preparation - REMEHA Quinta Ace Installation, User And Service Manual

Table of Contents

Advertisement

5.5
Unpacking & initial preparation
Fig.9
Unpacking the boiler
1
1
3
4
7625116 - v.04 - 17012017
1. Cut the packaging straps and remove.
2. Remove the cardboard box.
2
3. Take the 2 floor stands out of the packaging and place them on the
floor in front of the bottom of the boiler.
4. With 2 people, place the boiler upright on the floor stands.
5. Remove the pallet and the rest of the packaging.
Important
The boiler can now be moved with a lifting aid.
5
AD-0000137-02
5 Before installation
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents