6 Installation
Fig.23
Opening the connection box
1
X033
90º
3
4
12
90º
7a
7b
11
5
90º
34
6.6.4
The connection box is included with the delivery of the boiler as standard.
Use the connection cables supplied to connect the connection box to the
control unit. Proceed as follows:
2
X017
L = 0.4 m
10. Now connect the desired external controllers to the other connec­
11. Lift the holder up and slide it forward into position.
12. Tighten the 2 screws of the connection box holder underneath the
8
9
6
10
AD-0000117-03

Connecting the connection box

1. Connect the supplied connection cable X033 to the connector un­
derneath the boiler.
2. Connect the supplied connection cable X017 to the connector un­
derneath the boiler.
3. Loosen the 2 screws of the connection box holder underneath the
boiler by a quarter of a turn.
4. Push the holder slightly back and fold it down.
5. Loosen the 2 screws in the connection box by a quarter of a turn.
6. Open the cover of the connection box.
7. Slide and click the connection box into position on the connection
box holder.
8. Connect the connection cable X033 with the connector in the con­
nection box.
9. Connect the connection cable X017 with the connector in the con­
nection box.
tors. Proceed as follows:
Lay the cable under the strain relief clip.
Press the strain relief clip firmly in place.
Close the connection box.
Press the 2 screws in the connection box.
boiler by a quarter of a turn.
Important
The connection box can also be mounted on the wall. Use the
screw holes on the back of the connection box. The supplied con­
nection cables must not be extended. Special extension cables
are available as an accessory.
7625116 - v.04 - 17012017

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents