DECK MECHANISM DISASSEMBLY
Base Tension
(Fig. A-9-2)
(A)
31. Base Loading (Fig. A-9-1)
1) Remove the Screw(S7).
2) Lift the Base Loading up.
32. Base Tension (Fig. A-9-2)
1) Breakaway the (A) portion of the Base Tension from the
embossing of the Chassis.
2) Turn the Base Tension to counterclockwise direction and
lift it up.
(S7)
Base Loading
(Fig. A-9-1)
(B)
(D)
Fig. A-9
33. Arm Assembly Idler (Fig. A-9-3)
1) Make narrower the two parts, (B) and (C), as Fig. A-9-3.
2) Lift the Arm assembly Idler up.
NOTE
When disassembling, be careful not to be caught the (D) part
by the Chassis as Fig.
4-11
Arm Assembly Idler
(Fig. A-9-3)
(C)
Chassis
Need help?
Do you have a question about the HR-XV2EX and is the answer not in the manual?
Questions and answers