Installation
"
#
10
3
Installation
3.1
Incoming acceptance, transport and storage
3.1.1
Incoming acceptance
On receipt of the goods, check the following points:
• Check the packaging and the contents for damage.
• Check the shipment, make sure nothing is missing and that the scope of supply matches
your order.
3.1.2
Transport
The following instructions apply to unpacking and to transporting the device to its final
location:
• Transport the devices in the containers in which they are delivered.
• Do not remove the protection plates or caps on the process connections until you are ready
to install the device. This is particularly important in the case of sensors with PTFE linings.
Special notes on flanged devices
Caution!
• The wooden covers mounted on the flanges before the device leaves the factory protect the
linings on the flanges during storage and transportation. Do not remove these protection
plates until immediately before the device is installed in the pipe.
• Do not lift flanged devices by the transmitter housing or, in the case of the remote version,
by the connection housing.
Transporting flanged devices DN
Use webbing slings slung round the two process connections. Do not use chains, as they
could damage the housing.
Warning!
Risk of injury if the measuring device slips. The center of gravity of the assembled measuring
device might be higher than the points around which the slings are slung.
At all times, therefore, make sure that the device does not unexpectedly turn around its axis
or slip.
Fig. 4:
Transporting sensors with DN
Proline Promag 53 FOUNDATION Fieldbus
300 (12")
300 (12")
a0004294
Endress+Hauser
Need help?
Do you have a question about the Proline Promag 53 and is the answer not in the manual?