Endress+Hauser Proline Promag 53 Operating Instructions Manual page 11

Foundation fieldbus electromagnetic flowmeter
Hide thumbs Also See for Proline Promag 53:
Table of Contents

Advertisement

Proline Promag 53 FOUNDATION Fieldbus
"
Endress+Hauser
Transporting flanged devices DN > 300 (12")
Use only the metal eyes on the flanges for transporting the device, lifting it and positioning
the sensor in the piping.
Caution!
Do not attempt to lift the sensor with the tines of a fork-lift truck beneath the metal casing.
This would buckle the casing and damage the internal magnetic coils.
Fig. 5:
Transporting sensors with DN > 300 (12")
3.1.3
Storage
Note the following points:
• Pack the measuring device in such a way as to protect it reliably against impact for storage
(and transportation). The original packaging provides optimum protection.
• The storage temperature corresponds to the operating temperature range of the
measuring transmitter and the appropriate measuring sensors →  108.
• The measuring device must be protected against direct sunlight during storage in order to
avoid unacceptably high surface temperatures.
• Choose a storage location where moisture does not collect in the measuring device. This
will help prevent fungus and bacteria infestation which can damage the lining.
• Do not remove the protection plates or caps on the process connections until you are ready
to install the device. This is particularly important in the case of sensors with PTFE linings.
Installation
a0004295
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Proline Promag 53 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents