Kohler Comand Pro CH1000 Service Manual page 137

Table of Contents

Advertisement

Figure 10-106. Oil Sentry
Location.
2. Connect the green wire lead to the Oil Sentry™
terminal.
Install Blower Housing and Cylinder
Shrouds
1. Align and install the blower housing. See Figure
10-107.
Mounting
Locations
Figure 10-107. Installing Blower Housing.
2. Secure the blower housing with the four shoulder
screws. Torque the screws to 4.0 N·m (35 in. lb.)
for initial installations, or 2.0 N·m (18 in. lb.) for
reinstallations.
3. Install the two cylinder shrouds and secure
with the shoulder screws. Torque the screws to
4.0 N·m (35 in. lb.) for initial installations, or
2.0 N·m (18 in. lb.) for reinstallations. See Figure
10-108.
TM
Pressure Switch
Mounting
Locations
Figure 10-108. Installing Cylinder Shrouds.
Install Control Panel (If Equipped)
1. Install the control panel to the main control
bracket and oil fi lter housing. Torque the M6
screw going into the oil fi lter housing to 10.7 N·m
(95 in. lb.) into a new hole, or 7.3 N·m (65 in. lb.)
into a used hole. Torque the two upper M5 screws
to 6.2 N·m (55 in. lb.) into new holes, or 4.0 N·m
(35 in. lb.) into used holes. See Figure 10-109.
Control Lever
Knobs
Indicator
Light
Control Panel
Figure 10-109. Control Panel.
2. Connect the Oil Sentry
3. Install the knobs onto the control levers.
Section 10
Reassembly
Cylinder
Shrouds
Key Switch
TM
indicator light wires.
10.27
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Comand pro ch940

Table of Contents