Komatsu PW130ES-6K Operation & Maintenance Manual page 268

Hydraulic excavator
Table of Contents

Advertisement

OPTIONS, ATTACHMENTS
Shape of ditch 38° bucket
How to perform excavation
Operate the boom, the arm and the bucket to make the line A of
the side-plate of the bucket vertical.
To check this position guide plate B is installed beside the bucket
pins.
Hold this plate horizontal when digging.
TRAVELLING POSTURE
Before starting to travel, be sure to pull in and lock the outriggers,
and or raise the dozer blade.
Before travelling on public roads, the work equipment should be
positioned as follows:
1. Remove the bucket or attachment (refer to section see
"REPLACEMENT OF BUCKET" on page 264.)
2. Position the upper structure so that it is facing the front of the
undercarriage (the oscillation lock cylinders can be seen) and
insert the swing lock pin.
3. Fit link plate and spacers (Fig. 1)
INTRODUCTION OF ATTACHMENTS AND EXTENDING MACHINE SERVICE LIFE
267

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents