Maintenance Schedule Chart - Komatsu PW130ES-6K Operation & Maintenance Manual

Hydraulic excavator
Table of Contents

Advertisement

MAINTENANCE.

MAINTENANCE SCHEDULE CHART

"REPLACE FUEL FILTER CARTRIDGE"
"CHECK ENGINE VALVE CLEARANCE, ADJUST"
"CHANGE OIL IN TRANSMISSION, HUBS + AXLES."
"CHECK, CLEAN AND REPLACE THE AIR CLEANER ELEMENT"
"CLEAN INSIDE OF COOLING SYSTEM"
"CHECKING COOLANT LEVEL"
"CHECK AND TIGHTEN WHEEL NUTS"
"CHECK ELECTRICAL INTAKE AIR HEATER"
"CHECK ALTERNATOR"
"CHECK START MOTOR"
"REPLACE BUCKET SIDE CUTTERS"
"REPLACE BUCKET TEETH"
"ADJUST BUCKET CLEARANCE"
"CHECK WINDOW WASHER FLUID LEVEL, ADD FLUID"
"CHECK AND ADJUST AIR CONDITIONER"
"DRAIN ENGINE BREATHER OIL CATCHER"
"CHECK COOLANT LEVEL, ADD WATER"
"CHECK OIL LEVEL IN ENGINE OIL PAN, ADD OIL"
"CHECK FUEL LEVEL, ADD FUEL"
"CHECK OIL LEVEL IN HYDRAULIC TANK, ADD OIL"
"CHECK AIR CLEANER FOR CLOGGING"
"CHECK ELECTRIC WIRING"
"CHECK FOR WATER AND SEDIMENT IN SEDIMENTOR. DRAIN WATER AND SEDIMENT"
"DRAIN WATER AND SEDIMENT FROM FUEL TANK"
"LUBRICATING"
SERVICE ITEM
INITIAL 250 HOURS SERVICE (only after the first 250 hours)
WHEN REQUIRED
CHECK BEFORE STARTING
EVERY 50 HOURS SERVICE
EVERY 100 HOURS SERVICE
MAINTENANCE SCHEDULE CHART
page 187
page 187
page 187
page 188
page 189
page 192
page 195
page 195
page 195
page 196
page 196
page 197
page 197
page 198
page 198
page 199
page 200
page 200
page 201
page 202
page 202
page 203
page 203
page 204
PAGE
181

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents