OPERATION
NOTICE
The park brake internal components will be destroyed
during this operation.
ONLY USE IT IN AN EMERGENCY.
SWINGING (Slewing the upper carriage)
When operating the swing, check that the area around the ma-
chine is safe.
1. Before operating the swing, turn swing lock switch (1) OFF
(CANCELED).
NOTICE
Check that swing lock monitor (2) goes out at the same
time.
2. Operate left work equipment control lever (3) to swing the
upper structure.
3. When not operating the swing, turn swing lock switch (1) ON
(ACTUATED)
124
( 1 )
( 2 )
A
AM090650A
OPERATION
AW349440B
B