SYRUP AND
PLAIN WATER
INLET LINES(8)
*CAPPED TEE
(CARBONATED
WATER INLET LINE)
2. Open CO
cylinder shutoff valve slightly to allow lines to slowly fill with gas, then open valve fully to
2
back-seat valve. (Back-seating valve prevents leakage around valve shaft.)
WARNING: CO
CO
(carbon dioxide) gas leaks in the entire CO
2
suspected, particularly in a small area, immediately ventilate the contaminated area before
attempting to repair the leak. Personnel exposed to high concentration of CO
tremors which are followed rapidly by loss of consciousness and suffocation.
3. Check all CO
connections for leaks. Tighten loose connections.
2
4. Adjust primary CO
2
to specified pressures as follows:
317961000
FIGURE 3. INLET SUPPLY LINE CONNECTIONS
displaces oxygen. Strict attention must be observed in the prevention of
2
regulator for carbonator and secondary CO
* This CAPPED TEE is used when converting No. 3 dispensing valve
from a still (non-carbonated) to a carbonated drink. Refer to TABLE
OF CONTENTS for conversion instructions.
and soft drink system. If a CO
2
regulators for syrup tanks (see Figure 2)
2
10
POWER SWITCH
WATER TANK
DRAIN HOSE
DRIP TRAY
DRAIN HOSE
gas leak is
2
gas will experience
2