4.10.2.
Filling the siphon
1. Fill the siphon with water via the condensate tank (Up the level
marker).
CAUTION
Reinsert the condensate collector sealant cap.
4.10.3.
Filling the system
1. Fill the system with clean tap water. The boilers can function at an
operating pressure of between 0,8 - 7 bar.
2. Check the tightness of the water connections.
If the hydraulic pressure is lower than 0.8 bar (Only with the
hydraulic pressure sensor connected):
DIEMATIC iSystem control panel: The symbol bar
4
flashes.
IniControl control panel: The pressure value is
4
displayed on the screen.
If necessary, top up the water level in the heating system.
A filling and drain cock is fitted on the front section as
4
standard ( ½" ).