4. Installation
55
55
531
22
663
21,5
55
55
87,5
T003474-B
The service side with the inspection hatch on the heat exchanger is
considered to be the front of the boiler. The boiler is available in both
a 'left-hand' and 'right-hand' version. This means that the hydraulic
connections and the flue gas discharge are situated on either the left
or the right-hand side of the boiler. The control panel is on the front
as standard, but can easily be rotated so that it is on the short side.
To make the boiler level and to raise the wheels off the floor, the
adjustment bolts must be used. Turn the adjustment bolts out as soon
as the boiler is placed in the correct position. The picture shows the
support surface of the boiler (This is the position of the adjustment
bolts).
Boiler type
A (mm)
C330 ECO
280
350
723
430
500
570
1032
650
C 330 ECO - C 630 ECO
31/05/2012 - 7600532-01