5 Commissioning
5.1 Filling the siphon (Option)
Before commissioning: Fill the siphon with water
If operating with the siphon empty, combustion products
will escape into the premises in which the boiler is
installed.
07/04/2009 - 300016152-001-C
GTU C 330
OK
29