Seagull Models YAKOVLEV YAK 3 ARF Assembly Manual page 17

63 inch
Table of Contents

Advertisement

2) Use a pin drill and 4mm drill bit to
drill a small indentation in the mount for
the engine mounting screw.
4mm
3) Use a drill to drill the four holes in the
engine mount rails.
145mm
4mm
Machine screw M4x30mm
4) On the fire wall has the location for the
throttle pusshrod tube (pre-drill).
5) Slide the pushrod tube in the firewall
and guide it through the fuel tank mount.
Use medium C/A to glue the tube to the
firewall and the fuel tank mount.
6) Connect the Z-bend in the 450mm
throttle pushrod to the outer hole of the
carburetor arm.
7) Slide the throttle pushrod wire into
the tube. Position the engine between the
mounts. Use four M4x30mm machine
screws to secure the engine to the mount
as shown.
Pushrod wire.
17

Advertisement

Table of Contents
loading

Table of Contents