Power Cords Connections; Power On Procedure - Infortrend EonStor GS 3000 Series Hardware Manual

Hide thumbs Also See for EonStor GS 3000 Series:
Table of Contents

Advertisement

Power Cords Connections

Use the included cables. Connect them to the power sockets (in blue) for all PSUs.

Power On Procedure

Before you power on the RAID system, please power on the expansion enclosure
JBOD first if your network configuration has multiple arrays.
To power on the system please follow the procedures below.
Turn on the power switches to the "on" position for every PSUs' power switches
(shown in blue).
1. Power on the networking devices, e.g. switches.
2. Power on the host computers. The host computers should be the last devices
that are turned on. Please refer to the documentation that came with your host
computers to see their power on procedures.
Power switch location
82

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents