Connecting Power Cords; Power On Procedure - Infortrend EonStor DS 1024B Hardware Manual

Eonstor ds 1000 series
Table of Contents

Advertisement

Connecting Power Cords

Use the included cables and connect them to the power sockets (in blue).

Power On Procedure

Before you power on the RAID system, please power on the expansion JBOD
storage systems first if your network configuration has multiple arrays.
To power on the system please follow the procedures below.
1. Turn on the power switches to the "on" position for every PSUs' power switches,
from left to right.
NOTE
Make sure all power supply modules' switches are turned on!
2. Power on the networking devices, e.g. switches.
3. Power on the host computers. The host computers should be the last devices
that are turned on. Please refer to the documentation that came with your host
computers to see their power on procedures.
88

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eonstor ds 1012Eonstor ds 1024Eonstor ds 1016

Table of Contents