Slide Rail Kit Installation Guide; Slide Rail Kits; Enclosure Installation Prerequisites - Infortrend EonStor GS 3000 Series Hardware Manual

Hide thumbs Also See for EonStor GS 3000 Series:
Table of Contents

Advertisement

Slide Rail Kit Installation Guide

The table is categorized into model numbers in alphabetical / numeric order so users
can fast locate the corresponding slide rail kit for their respective enclosure.

Slide Rail Kits

If you are unable to locate clear instructions on installing your enclosure, please
contact Technical Support!

Enclosure Installation Prerequisites

To ensure proper installation and functionality of the RAID system, please observe the
following warnings:
Cross check all components have been received against the "Unpacking List". Contact
your vendor immediately if anything is missing
Install the enclosure as-is out of the packaging; install hard drives and optional
modules (FBM / super capacitor) after the enclosure has been mounted
Wear an anti-static wristband before and during the installation procedure
It is recommended to plug the system into two different power sources (e.g. into a
power outlet and another into a UPS)
Ensure the rack which the enclosure will be mounted onto has proper grounding and
over-current protection
Do not obstruct ventilation openings; provide 20cm of free space at the front and back
of the enclosure for air circulation; keep the ambient temperature below 35 degrees
Celsius
Slide Rail Installation Guide
125

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents