Installing And Connecting The Device; Preparing For Installation; Unpacking And Checking The Delivery - Siemens SIMATIC IPC547D Operating Instructions Manual

Table of Contents

Advertisement

Installing and connecting the device

3.1

Preparing for installation

3.1.1

Unpacking and checking the delivery

Procedure
1. When accepting a delivery, please check the packaging for visible transport damage.
2. If any transport damage is present at the time of delivery, lodge a complaint at the
3. Unpack the device at its installation location.
4. Keep the original packaging in case you have to transport the unit again.
5. Check the contents of the packaging and any accessories you may have ordered for
6. If the contents of the packaging are incomplete, damaged or do not match your order,
SIMATIC IPC547D
Operating Instructions, 06/2011, A5E03473780-01
shipping company in charge. Have the shipper confirm the transport damage
immediately.
NOTICE
Damage to the device during transport and storage
If a device is transported or stored without packaging, shocks, vibrations, pressure and
moisture may impact the unprotected unit. A damaged packaging indicates that ambient
conditions have already had a massive impact on the device.
The device may be damaged.
Do not dispose of the original packaging. Pack the device during transportation and
storage.
completeness and damage.
inform the responsible delivery service immediately. Fax the enclosed form "SIMATIC
IPC/PG Quality Control Report".
3
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents