Operation; Operation Overview; Preparations Before Starting Typhoon Fla 7000 - GE HEALTHCARE Typhoon FLA 7000 User Manual

Table of Contents

Advertisement

9 Operation

9
Operation
9.1

Operation overview

Using Typhoon FLA 7000 comprises a series of steps outlined below. Detailed explanations
are provided in subsequent chapters.
9.2

Preparations before starting Typhoon FLA 7000

Checklist before starting
Typhoon FLA 7000
66
Phosphorimaging samples
Expose the storage phosphor screen
Typhoon FLA 7000 is placed on a sturdy, horizontal surface.
Typhoon FLA 7000 is connected to a grounded wall outlet.
The air intake fan on the rear side of Typhoon FLA 7000 is unobstructed.
The air exhaust fan on the rear side of Typhoon FLA 7000 is unobstructed.
There are no objects on top of Typhoon FLA 7000.
There is no stage in the stage rack.
Turn on the Typhoon FLA 7000
Start the computer and launch the Typhoon FLA 7000
Control Software
Set the reading parameters
Place the stage and the sample in the Typhoon FLA
7000
Read the sample
Typhoon FLA 7000 User Manual 28-9607-62 AC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents