Installation; T Preparation - Paradyne bitstorm 4800 Installation Manual

Hide thumbs Also See for bitstorm 4800:
Table of Contents

Advertisement

Installation

Preparation
Consider the following before installing the BitStorm™ 4800:
T T
T T
T T
T
T T
T T
4821-A2-GN20-00
Installation Site
Your installation site should be well ventilated, clean, and free of
environmental extremes.
Installation Options
The BitStorm 4800 may be:
— Mounted with the included mounting brackets in a standard 483 mm (19")
or 584 mm (23") rack, or, with separately purchased mounting brackets, in
a 535 mm (21") ETSI or 610 mm (24") EIA rack. ETSI brackets are
available from Paradyne. See
As many BitStorm 4800 units may be mounted in a standard rack as there
are 44.45 mm (1.75" ) spaces in the rack, so long as adequate cooling is
provided.
— Mounted vertically against a wall.
The standard mounting brackets provided can be fastened to the base of
the unit for wall mounting.
— Set on a shelf or desktop.
Up to eight BitStorm 4800 units may be stacked on a shelf or desktop.
Management Module
A 4800 or 4804 Management Module must be installed in each BitStorm 4800.
Power
The BitStorm 4800 operates from a standard AC power supply (90 to
264 VAC at 47 to 63 Hz).
Fiber Optic Uplink and Downlink
Use of either of the fiber optic ports requires use of a Small Form-factor
Pluggable (SFP) transceiver, not included. It must be compliant with the SFP
Transceiver MultiSource Agreement of September 14, 2000, and provide a
1000BaseX interface.
Other Cabling
With the exception of the power cord, no cables are provided with the
BitStorm 4800. See
Cables Required
you need to procure before installation.
April 2002
Appendix B, Equipment List
on page 1-2 to determine what cables
1
.
1-1

Advertisement

Table of Contents
loading

Table of Contents