Ecom EN2 Operating Instructions Manual page 46

Hide thumbs Also See for EN2:
Table of Contents

Advertisement

Loading Test
The „Loading Test" acc. to DVGW – TRGI Process Instructions G
600 by pipes (operation pressure up to 100 hPa) is deposited as a
measurement routine in the ecom-EN2. Proceed as follows:
1. Connect the ecom-UNO to the connection AUX of the ecom-EN2.
2. Close the conduit with a suitable adapter (test stopple, high-
pressure stopple or one-pipe counter cap).
3. Connect the components as described before.
4. Scroll with cursor keys <Up/Down> to the menu „Loading Test".
Activate with <Enter>.
5. Create the pre-adjusted test pressure with the air pump (the unit
beeps as soon as the pressure level is achieved).
6. Interrupt the connection to the air pump (switch-off the ball valve).
7. Wait for stabilization time (if the pressure remains in the range
„test pressure +/- 10% during stabilization time, so the measurement
will start).
8. Once the measurement time is over, the result is displayed and
can be printed by pressing <Print>.
9. If the menu „Loading Test" is selected again, so the result can
be called up with <F4> (as long as the ecom-EN2 is on) or a new
measurement can be started with <F1>.
Page 46
ecom-EN2

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EN2 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

En2

Table of Contents