13.5. Pressure Tests (Option)

1. Use only air or inert gas for check !
2. Respect the „Technical Rules for
Gas installations"!
Connection hose
(Pump – Cross piece)
Safety valve
Cross piece
Connection hose
(Gas system – Cross piece)
Conic test stopple
One-pipe counter cap
High-pressure test
stopple
ecom-EN2
or
or
Connection hose
(ecom-EN2/UNO –
Cross piece)
Connection Squirt
or Soot pump
Squirt
Air pump
Electrical
connection
ecom-EN2
EN2/UNO
Connection ecom-
EN2 (delta p-)
Connection
ecom-UNO (+)
ecom-UNO (only for Loading
and Tightness Test)
Page 43