Toshiba PORTEGE S100 Maintenance Manual page 308

Hide thumbs Also See for PORTEGE S100:
Table of Contents

Advertisement

4 Replacement Procedure
4.29 Fluorescent Lamp
Fasten screws of the PCB and bezel
1. Fasten four screws shown in Figure 4-62.
N・
CAUTION: (1) The tightening torque must not exceed 0.176
m (1.8kgf
cm) for all the
screws. No loose fastening is allowed.
(2) For the Philips screwdrivers, use an insert bit of point size 0.
Insulation sheet
Screw
Screw
Screw
Screw
Figure 4-62 Replacing 14.1 Inch TMD fluorescent lamp (SXGA+) (10)
4-90
PORTEGE S100 Maintenance Manual (960-508)
Downloaded from LpManual.com Manuals

Advertisement

Table of Contents
loading

Table of Contents