Toshiba PORTEGE S100 Maintenance Manual page 296

Hide thumbs Also See for PORTEGE S100:
Table of Contents

Advertisement

4 Replacement Procedure
Fasten screws of the PCB and bezel
1. Fasten four screws on the right edge shown in Figure 4-51.
2. Fasten four screws on the left edge shown in Figure 4-51.
CAUTION: (1) Fasten the screws in the orders shown in Figure 4-51. No loose fastening
Figure 4-51 Replacing 14.1 Inch TMD fluorescent lamp (XGA) (10)
4-78
Downloaded from LpManual.com Manuals
is allowed.
(2) The tightening torque must not exceed 0.147
eight screws.
(3) For the Philips screwdrivers, use an insert bit of point size 0.
N・
m (1.5kgf
Insulation sheet
Product Label
PORTEGE S100 Maintenance Manual (960-508)
4.29 Fluorescent Lamp
cm) for all the

Advertisement

Table of Contents
loading

Table of Contents