Mounting Steps With Screwed Connection - Vega VEGABAR 66 Operating Instructions Manual

Foundation fieldbus
Table of Contents

Advertisement

VEGABAR 66 • Foundation Fieldbus

4.4 Mounting steps with screwed connection

Fig. 8: Threaded fitting
1
Suspension cable
2
Seal screw
3
Cone bushing
4
Seal cone
5
Threaded fitting
6
Seal
Mount VEGABAR 66 with screwed connection as follows:
1
Weld the welded socket into the vessel top
2
Lower VEGABAR 66 to the requested height by means on the
welded socket G1½ A or 1½ NPT on the vessel side
3
Insert the suspension cable from below into the open screwed
connection
4
Slide the seal cone and the cone sleeve over the suspension
cable, fasten manually with the seal screw
5
Screw the screwed connection into the socket, fasten with SW 30
and then fasten seal screw with SW 19
How to correct the height:
1
Loosen seal screw with SW 19
2
Slide seal cone and cone sleeve to the requested position on the
cable
3
Fasten the seal screw
Removal is carried out in reverse order.