Revision Notes - ABB RET670 Installation And Commissioning Manual

Hide thumbs Also See for RET670:
Table of Contents

Advertisement

Section 1
Introduction
Documents related to RET670
Configuration diagram F. Tap changer control package for four parallel transformers. (A25)
Setting example 1, 400/230 kV 500 MVA Transformer, YNyn connected
Setting example 2, 132/230 kV 40 MVA Transformer, YNd1 connected
Connection and Installation components
Test system, COMBITEST
Accessories for IED 670
Getting started guide IED 670
SPA and LON signal list for IED 670, ver. 1.1
IEC 61850 Data objects list for IED 670, ver. 1.1
Generic IEC 61850 IED Connectivity package
Protection and Control IED Manager PCM 600 Installation sheet
Engineering guide IED 670 products
More information can be found on www.abb.com/substationautomation.
1.1.5
14

Revision notes

Revision
Description
C
No functionality added. Changes made in content due to problem reports.
1MRK 504 088-UEN C
Identity number
1MRK 004 500-140
1MRK 504 083-WEN
1MRK 504 084-WEN
1MRK 513 003-BEN
1MRK 512 001-BEN
1MRK 514 012-BEN
1MRK 500 080-UEN
1MRK 500 083-WEN
1MRK 500 084-WEN
1KHA001027-UEN
1MRS755552
1MRK 511 179-UEN
Installation and commissioning manual