ABB RET670 Installation And Commissioning Manual page 181

Hide thumbs Also See for RET670:
Table of Contents

Advertisement

1MRK 504 088-UEN C
Installation and commissioning manual
A secondary injection test set with the possibility to alter the phase angle by
regulation of the resistive and reactive components is needed. The test set must also
be able to generate different frequencies on different outputs.
The description below applies for a system with a nominal
frequency of 50 Hz but can be directly transferred to 60 Hz.
SESRSYN can be set to use different phases, phase to earth or
phase to phase. Use the set voltages instead of what is indicated below.
Figure
66
shows the general test connection principle, which can be used during
testing. This description describes the test of the version intended for one bay.
Figure
67
shows the general test connection for a 1½ breaker diameter with one-
phase voltage connected to the line side.
Test
equipment
U-Line
N
IEC05000480 V2 EN
Figure 66:
General test connection with three-phase voltage connected to the
line side
Verifying settings by secondary injection
IED
U-Bus
U-Bus
N
UL1
Input Phase
UL2
UL3
L12,L23,L31
N
IEC05000480-2-en.vsd
Section 13
UMeasure
Ph/N
Ph/Ph
L1,L2,L3
175