Verifying Analog Primary And Secondary Measurement - ABB RET670 Installation And Commissioning Manual

Hide thumbs Also See for RET670:
Table of Contents

Advertisement

1MRK 504 088-UEN C
13.2.5
Installation and commissioning manual
IL1
IL2
IL3
IN
UL1
UL2
UL3
UN
IEC09000652 V1 EN
Figure 51:
Connection example of the test equipment to the IED when test
equipment is connected to the transformer input module

Verifying analog primary and secondary measurement

Verify that the connections are correct and that measuring and scaling is correctly.
This is done by injecting current and voltage to the IED.
Apply input signals as needed according to the actual hardware and
the application configuration made in PCM600.
1.
Inject a symmetrical three-phase voltage and current at rated value.
2.
Compare the injected value with the measured values.
The voltage and current phasor menu in the local HMI is located under Main
menu/Measurements/Analog primary values and Main menu/
Measurements/Analog secondary values.
3.
Compare the frequency reading with the set frequency and the direction of the
power.
The frequency and active power are located under Main menu/
Measurements/Monitoring/ServiceValues(MMXU)/SVRx. Then navigate
to the bottom of the list to find the frequency.
4.
Inject an unsymmetrical three phase voltage and current, to verify that phases
are correctly connected.
If some setting deviates check the analog input settings under
Main menu/Settings/General settings/Analog modules
Verifying settings by secondary injection
IL1
IL2
IL3
IN (I4,I5)
UL1
UL2
UL3
UN
UN (U4,U5)
TRIP L1
TRIP L2
TRIP L3
IEC 61850
IEC09000652-1-en.vsd
Section 13
109

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents