Pump down procedure (When removing the product)

1. Select Cool mode after turning on the air conditioner and run the compressor for 3 minutes.
2. Release the valve caps on high and low pressure side.
3. Use L wrench to close the valve on the high pressure side.
4. Approximately 2 minutes later, close the valve on the low pressure side.
5. Stop the operation of the air conditioner
6. Disconnect the pipes.

Electrical work

Wiring work must be done by the certified expert.
f Wiring work should be performed in accordance with related laws such as technical specification on electric installation
f
or installation guide.
f You must install exclusive power supply.
f
- If you use multi-outlet, there is a risk of electric shock or fire.
- After initial installation, customer is responsible for re-installation fee.
f Please install a circuit breaker. (Rated current sensitivity over 30mA)
f
- After initial installation, customer is responsible for re-installation fee.
f Tightening torque of the screws on the terminal block should be within the rated range and make sure that they don't
f
get loosened.
f Please connect ground wire.
f
❋ ❋ Please install the power wire with its length shorter than 50m. If the length of the power wire exceeds 50m inevitably,
product may not work or wire could get damaged. Therefore please contact the system expert.
Mirage_AP36M0@_IBIM_E_34573A(1).indd 41
41
2012-02-21 오후 1:09:55

Advertisement

Table of Contents
loading

Table of Contents