Final Check and Trial Operation

To complete the installation, perform the following checks and tests to
ensure that the air conditioner operates correctly.
Check the followings:
1. Press the Power
button and check the following:
The indicator on the indoor unit lights up.
The airflow blade opens and the fan gears up for operation.
2. Press the Mode button to select Cool or Heat mode.
In Cool mode, use Temp + or - button and set the temperature at 16°C.
In Heat mode, use Temp + or - button and set the temperature at 30°C.
Cooling mode (indoor unit check)
Heating mode (indoor unit check)
In heating mode, the indoor fan motor can remain off to avoid cold air blown into conditioned space.
3. Press the Air swing
The airflow blades work properly.
4. Press the Power
button to stop the operation.
place.

Pump down procedure (when removing the product)

1. Turn on the air conditioner and select Cool mode to run the compressor for 3 minutes.
2 . Release the valve caps on High and Low pressure side.
3 . Use L wrench to close the valve on the high pressure side.
4 . Approximately 2 minutes after, close the valve on the low pressure side.
5 . Stop operation of the air conditioner.
6 . Disconnect the pipes.
Maldive EUR_AQV09P@_IBIM_32436A_E.indd 39
button and check the following:
39
2010-11-11 15:02:29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aqv12psbAqv18psbAqv24psbAqv09pwaAqv12pwa

Table of Contents