Adjusting The Hitch Eye; Set Up Ball Head Coupling - Claas ROLLANT 240 Operating Instructions Manual

Table of Contents

Advertisement

Prior to operation
Z
2
Z
2
K
2
7.2.10

Adjusting the hitch eye

The hitch eye (Z) must be set up in a position parallel
with the ground.
The hitch eye is screwed onto the towing fork using a
screw type M20 x 1.5 x 160-10.9 (2), a nut and a
counter nut.
– Tightening torque (for the nut) = 486 Nm
(357.4 ft lb)
– Tightening torque (for the counter nut) = 300 Nm
(220.6 ft lb)
26
Attention!
Secure the baler so that it cannot roll away.
Park the baler on support feet.
Attention!
Tighten up the fastening screws (2) after the
first 10 hours of operation, and then check
they are still fitting tightly after every 50 hours
of operation.
27
Hitch up the baler and secure it.
(Fig. 26, 27)

Set up ball head coupling

(only permitted in accordance with the customary local
laws)
The ball head coupling (K) must be set up in a parallel
position to the ground.
The ball head coupling is screwed to the towing fork
with a screw type M20 x 1.5 x 160-10.9 (2).
Tightening torque (for the nut) = 486 Nm
(357.4 ft lb)
Tightening torque (for the counter nut)= 300 Nm
(220.6 ft lb)
28
Attention!
Secure the baler to prevent it from rolling and
rest on its jack stand.
Tighten up the fastening screws (2) after the
first 10 hours of operation, and then check
they are still fitting tightly after every 50 hours
of operation.
(Fig. 26, 28)
Hitch up the baler and secure it.
BA ROLLANT 240 - 250 - 254 - 255 - 000 299 119 5

Advertisement

Table of Contents
loading

Table of Contents