Tests and Adjustments
Information in This Chapter
Information in This Chapter
This chapter contains procedures to help you check, verify, and adjust your PNA.
• The checks verify the operation of the assemblies in your analyzer.
• The verification compares the operation of your analyzer to a gold standard.
• The adjustments allow you to tune your analyzer for maximum response.
A description of the performance tests in the Agilent N7840A software
NOTE
package is included in this chapter. The Agilent N7840A software package
must be purchased separately.
Chapter Three at-a-Glance
Section Title
Before You Begin
About System
Verification and
Performance Tests
ANSI/NCSL
Z540–1–1994
Verification
Non-ANSI/NCSL
Z540–1–1994
Verification
Preliminary Checks
3-2
Summary of Content
Items to consider or procedures to perform before
testing is begun:
•
Verify the Operating Environment
•
Protect Against Electrostatic Discharge (ESD)
•
Allow the Analyzer to Warm Up
•
Review the Principles of Connector Care
Descriptions of:
•
System Specifications
•
Instrument Specifications
•
System Verification Procedure
•
Performance Tests
•
Certificate of Calibration
The ANSI/NCSL Z540-1-1994 process of verifying your
analyzer.
The non-ANSI/NCSL Z540-1-1994 process of verifying
your analyzer.
Performing the operator's check.
Checking your test cables.
Perform these checks before performing system
verification.
PNA Series Microwave Network Analyzers
Start Page
Page 3-4
Page 3-6
Page 3-8
Page 3-9
Page 3-10
Service Guide N5230-90014
N5230A