Installation; Unpacking The Appliance - Metos RG-400 Installation And Operation Manual

Vegetable
Table of Contents

Advertisement

Installation

4. Installation

4.1 Unpacking the appliance

Check that all of the parts have been delivered, that the machine operates as intended, and
that nothing has been damaged in transit. The machine supplier should be notified of any
shortcomings within eight days.
4.2 Installation
If the machine does not perform correctly, it must receive attention before it is taken into
operation.
Connect the macine to an electric power supply which is suitable for the machine.
Remove the cutting tool (3) before installing the machine.
Reset the adjustable feet as necessary to make sure that the machine stands firmly.
Locate the hanger (5:A) for the cutting tools (3) on the wall in the vicinity of the
machine for convenient and safe use.
Check that the shaft (2:J) rotates clockwise.
Check that the machine stops when the locking handle (2:F) is folded down.
Check that the machine stops when the locking knob for the feed hopper attach-
ment (7:D) or tube attachment (8:D) is turned clockwise to the unlocked position,
and that the machine restarts when the locking knob is turned anti-clockwise to the
locked position.
Chech that the machine stops when the manual (1:C) or pneumatic (1:D) push feed
attachment feed plate (6:A) is swung to the side so that the feed cylinder opening
(6:B) is larger than 60 mm, and that the machine restarts when the push feed at-
tachment is swung back over the feed cylinder.
22.2.2007
Rev. 2.0
15

Advertisement

Table of Contents
loading

Table of Contents