Define the minimum and maximum frequencies at which the motor will operate
when it is enabled.
With respect to the minimum frequency selected, the analog input can be scaled
accordingly in this step, e.g. 20 % (0 V input signal then corresponds to 20 %, or
10 Hz).
Enter the ramp-up and ramp-down times in seconds. Press
the parameter and keys
Rating
0.37 – 3 kW
4 – 15 kW
18.5 – 30 kW
37 – 90 kW
You can specify an alternative ramp-down time if necessary.
Activates the motor data identification process. A motor ID process is compulsory
if the CTRL MODE (P1300) has been set to 20 (Sensorless Vector Control).
Motor data identification is initiated when the drive is first enabled following basic
commissioning.
The result of the motor data identification process must be copied from RAM to
ROM! (Options→RAM to ROM)
Confirm that the basic commissioning has been completed. The variable speed
drive will compute the motor data.
1. Press
2. Use keys
3. Press
process.
Table 9: Commissioning with BOP-2
Carrying out basic commissioning
and
to change the value.
Recommended ramp time for fans
30s
60s
90s
120s
to change the parameter.
and
to select "YES".
to confirm your selection and complete the basic commissioning