MPI linkcom 5 User Manual page 17

Table of Contents

Advertisement

LinkCom 5 User Manual
The green LED's on the LinkCom 5 PrintServer front will blink during the power up
and self-test cycle. A successful power up sequence will end with the LAN led being
constantly lit (indicating that network configuration was successful).
When the LinkCom 5 has successfully completed the power up process it is ready to
be configured using PrintGuide. Refer to section 7 Configuring LinkCom 5
PrintServer for more information about setting up the PrintServer with PrintGuide.
Consult sections 6.4 LED signalling explained, 10 LED signalling explained in details
and 15.2 LinkCom 5 hangs during a restart for help if the PrintServer fail during the
start-up process.
17
Page

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the linkcom 5 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents